What the handover certificate is
When a developer hands over your new apartment or house, it asks you to sign an acta de entrega (handover certificate). It is not a formality. Ley 29571, Peru’s consumer protection code, gives it a legal role. Article 79 says:
“Al momento de la entrega del inmueble, el consumidor tiene el derecho de expresar por escrito su aprobación respecto a las características, condiciones y estado en general del bien que se le entrega. De igual modo, el consumidor puede expresar su desaprobación siempre que esta entrega no corresponda a características y condiciones previstas en el contrato […]”
(At handover, you have the right to state in writing that you approve the features, condition and general state of the property. You may also state your disapproval where what you receive does not match the features and conditions in the contract.)
For a home bought off-plan, the same article says you can reject “desperfectos, deficiencias u otras condiciones que desmejoren el valor del inmueble que se le entrega, o que impidan o limiten su uso” (defects, shortcomings or other conditions that lower its value or prevent or limit its use). If that happens, you can demand “la reparación, la reducción del precio o la resolución o rescisión del contrato” (repair, a price reduction, or termination of the contract).
In short: the certificate is where the law expects you to say, in writing, whether what you got matches what you bought.
Does signing “conforme” waive your right to complain?
Not for what you could not see. Three texts point that way:
- Article 1.3 of Ley 29571: “Es nula la renuncia a los derechos reconocidos por la presente norma, siendo nulo todo pacto en contrario.” (Any waiver of the rights in this law is void, and so is any agreement to the contrary.)
- Article 50, literal g), makes unfair and void any clause “que establezcan la renuncia del consumidor a formular denuncia por infracción a las normas del presente Código” (that makes the consumer waive the right to file a complaint for breaches of the Code).
- Indecopi’s guide to real-estate products: “los errores o defectos pueden ser advertidos al momento de la recepción del inmueble por parte del consumidor, o de manera posterior” (errors or defects may be noticed when the consumer receives the property, or later). It adds that “las obligaciones del proveedor inmobiliario no terminan con la entrega” (the developer’s duties do not end at handover).
The Civil Code says the same from another angle. Article 1503: “El transferente está obligado al saneamiento por los vicios ocultos existentes al momento de la transferencia.” (The seller must answer for hidden defects that existed at the time of transfer.) A hidden defect is, by definition, one you did not see at handover. Your signature does not make it visible.
None of these norms mentions the handover certificate in those words. That a “conforme” signature does not erase your right to claim hidden defects is our reading of them.
What you do lose: evidence about visible defects
Signing “conforme” without looking has a cost. Civil Code article 1504 says:
“No se consideran vicios ocultos los que el adquirente pueda conocer actuando con la diligencia exigible de acuerdo con su aptitud personal y con las circunstancias.”
(Defects the buyer could have spotted with the care expected given their personal ability and the circumstances are not hidden defects.)
A door that does not close, a scratched floor or a dead socket all show up in a normal inspection. If you approved the condition of the home in writing and noted nothing, the company will say you took it that way. Indecopi warns about this in its guide:
“Resulta indispensable que el consumidor deje constancia de las disconformidades verificadas al momento de la entrega del inmueble, a efectos de contar con algún medio probatorio para sustentar un eventual reclamo o denuncia administrativa contra el proveedor.”
(It is essential that the consumer records any problems found at handover, so as to have evidence for a later complaint against the developer.)
What to check before you sign
- Against the contract: floor area, layout, finishes, fittings, and what the advertising showed. Article 79 measures what you receive against the contract.
- Services: hot and cold water, pressure, drains, toilets, sockets, switches, the fuse board, gas, intercom, doorbell.
- Joinery: doors, locks, windows, sliding doors, wardrobes, kitchen units.
- Surfaces: cracks, damp, stains, paint, grout, loose or uneven floors.
- Common areas: Indecopi’s guide expressly includes “las que correspondan a las áreas comunes” (those of the common areas). Check corridors, lift, parking, storage unit and façade.
Go in daylight, take dated photos and video and, if you can, bring someone who knows construction.
What to write in the observations
Write before you sign, on the certificate itself. If the form has no space, use the margins or an annex signed by both sides. If the certificate is in Spanish, write in Spanish.
- One defect per line, with room and location: “cocina: grifo gotea” (kitchen: tap drips), “sala: fisura en muro junto a la ventana” (living room: crack in the wall by the window).
- What you could not test: “no se probó la terma por falta de gas” (water heater not tested, no gas).
- What is missing: keys, remotes, manuals, promised appliances.
- A reservation line: “Mi firma no implica conformidad con lo que no pudo verificarse ni renuncia a reclamar vicios ocultos o defectos que aparezcan después.” (My signature does not mean I accept what could not be checked, nor that I waive claims for hidden defects or defects that appear later.)
That last line does not create a new right. The law already gives it to you. It only puts on record that you did not mean to give it up.
Ask for a copy signed by both sides.
If a defect appears later
There are two different periods. Do not mix them up.
Consumer warranty for structural aspects. Article 80, literal a), of Ley 29571, as amended by Ley 30534, sets warranty periods: for components or materials, “de acuerdo con lo establecido por el proveedor de los mismos” (as set by their supplier); for structural aspects, “como mínimo diez (10) años desde emitido el certificado de finalización de obra y recepción de obra por parte de la municipalidad” (at least ten years from the municipality’s certificate of completion and acceptance of the works).
Civil action for hidden defects. Civil Code article 1514 is short: actions to terminate the sale or cut the price “caducan […] a los seis, de inmuebles. Los plazos se computan desde el momento de la recepción del bien” (expire after six months for real property, counted from receipt of the property). In practice, the date on your handover certificate is the evidence of receipt. We cover this in detail in hidden defects in a property sale.
Against the company that sold to you, article 19 of Ley 29571 is the basis: “El proveedor responde por la idoneidad y calidad de los productos y servicios ofrecidos” (the supplier answers for the fitness and quality of what it offers).
What about the builder?
Civil Code article 1784 is often cited for construction defects:
“Si en el curso de los cinco años desde su aceptación la obra se destruye, total o parcialmente, o bien presenta evidente peligro de ruina o graves defectos por vicio de la construcción, el contratista es responsable ante el comitente o sus herederos, siempre que se le avise por escrito de fecha cierta dentro de los seis meses siguientes al descubrimiento. Todo pacto distinto es nulo.”
(If within five years of acceptance the works collapse, wholly or partly, or show evident danger of ruin or serious construction defects, the contractor is liable to the commissioning party or their heirs, provided it is notified in writing, with a verifiable date, within six months of discovery. Any agreement to the contrary is void.)
Note who it protects: the comitente, the party that commissioned the works from the contractor. If you bought from a developer, the developer was usually the comitente, not you. We did not review whether a buyer can rely on this article directly. Your consumer claim goes against the company that sold to you.
How to complain
The channels (complaints book, Reclama Virtual, the Defensoría del Cliente Inmobiliario, a complaint to Indecopi, and consumer arbitration) and their deadlines are in our guide buying a home in Peru: what to check before you sign. If your contract has clauses that limit your claims, see adhesion contracts and unfair terms.
What this page does not cover
We did not review Indecopi decisions or court rulings on the effect of signing “conforme” on a handover certificate. We do not cover buying from a private individual who does not sell property as a business (the general guide explains that difference), late delivery, a smaller floor area in detail, or subdividing and registering the property.
How to file
- Bring your contract and plans to the handoverArticle 79 compares what you receive with the features and conditions set in the contract. Check floor area, layout, finishes and what the advertising showed.
- Go room by room and test everythingRun taps and drains, test sockets, switches, doors, windows and the intercom. Look at walls, ceilings and floors. Take dated photos and video.
- Write every observation on the certificateOne line per defect, with room and location. Also note what you could not test and that your signature does not waive claims for hidden defects. Sign after your observations, not before.
- Keep a copy signed by both sidesIt is your main evidence. If the company refuses to take your observations, put them in its complaints book.
- If a defect shows up later, complain in writing at onceKeep the dates. The civil hidden-defects route has a short deadline counted from receipt. The ways to complain to the company and to Indecopi are in our general guide to buying a home.
What people fail to ask in time
You have the keys, but is your apartment already subdivided and registered in your name?
Find out before it matters →What most people believe — and what the law says
Once I sign "conforme", I can't claim anything.
Article 1.3 of Ley 29571 voids any waiver of consumer rights, and Indecopi's guide says defects may be noticed at handover "o de manera posterior" (or later). The signature does not erase your right to claim what you could not see.
Signing "conforme" has no consequences.
It does, as evidence. Civil Code article 1504 says defects you could have spotted with due care are not hidden defects. If you approved the condition of the home in writing and noted nothing, a visible defect becomes much harder to claim later.
If the developer won't let me write observations, I have to sign anyway.
Article 79 of Ley 29571 gives you the right to state your disapproval in writing at handover. If the form has no space, write by hand on the certificate or on a separate sheet, and keep a copy.
The warranty lasts however long the developer says.
For components and materials, the supplier's terms apply. For structural aspects, article 80 of Ley 29571 sets a minimum of ten years from the municipality's certificate of completion and acceptance of the works.
Frequently asked questions
I signed "conforme" and months later a leak appeared. Can I still claim?
Yes, if the defect could not be seen at handover. Indecopi's guide says defects may be noticed at handover or later, and any waiver of your consumer rights is void (article 1.3 of Ley 29571). Complain in writing as soon as you notice it. If you use the civil hidden-defects route, article 1514 gives you six months from when you received the property.
What should I write in the observations section?
Each defect on its own line, with the room and the exact spot: "master bedroom: closet door does not close", "guest bathroom: loose grout next to the shower". Note what you could not test (for example, "hot water not tested, no gas connected") and add a line saying your signature does not mean you accept what could not be checked or waive claims for hidden defects. Write it in Spanish if the certificate is in Spanish.
The developer says I only get the keys if I sign "conforme" with no observations. Is that legal?
Article 79 of Ley 29571 recognises your right to state your disapproval in writing when you receive the property. We found no norm that lets a seller make handover conditional on giving that up. Write your observations anyway, ask for a copy and, if they refuse, record it in their *libro de reclamaciones* (complaints book).
What about defects in the building's common areas?
Indecopi's guide says the seller must guarantee the features offered and agreed, including those of the common areas. Note what you see in corridors, lifts, parking and the façade on your own certificate. The ways to complain are in our general guide to buying a home.
Can I go after the construction company instead of the developer?
Civil Code article 1784 makes the contractor liable to the *comitente*, the party who commissioned the works. If you bought from a developer, the developer usually commissioned the works, not you. We did not review whether a buyer can use that article directly. As a consumer, the party that answers to you is the one that sold to you (article 19 of Ley 29571).
The exact law
Ley N.º 29571, Código de Protección y Defensa del ConsumidorArtículo 79read
At handover you may approve or reject in writing
«Al momento de la entrega del inmueble, el consumidor tiene el derecho de expresar por escrito su aprobación respecto a las características, condiciones y estado en general del bien que se le entrega. De igual modo, el consumidor puede expresar su desaprobación siempre que esta entrega no corresponda a características y condiciones previstas en el contrato, según las siguientes reglas: [...] 2. En el caso de venta de bienes futuros, el consumidor puede expresar su desaprobación sobre desperfectos, deficiencias u otras condiciones que desmejoren el valor del inmueble que se le entrega, o que impidan o limiten su uso. [...] 4. De presentarse alguna de estas situaciones, el consumidor puede exigir, a través de los mecanismos legales pertinentes, la reparación, la reducción del precio o la resolución o rescisión del contrato, según corresponda.»
↳Artículo 1, numeral 1.3read
Any waiver of consumer rights is void
«Es nula la renuncia a los derechos reconocidos por la presente norma, siendo nulo todo pacto en contrario.»
↳Artículo 50, literal g)read
A clause waiving your right to file a complaint is unfair and void
«Son cláusulas abusivas de ineficacia absoluta las siguientes: [...] g. Las que establezcan la renuncia del consumidor a formular denuncia por infracción a las normas del presente Código.»
Ley N.º 29571, Código de Protección y Defensa del Consumidor (amended by Ley N.º 30534)Artículo 80, literal a)read
Minimum ten-year warranty for structural aspects
«Los períodos de garantía, que son establecidos por el proveedor de acuerdo con los siguientes criterios: (i) si son componentes o materiales, de acuerdo con lo establecido por el proveedor de los mismos; (ii) si son aspectos estructurales, como mínimo diez (10) años desde emitido el certificado de finalización de obra y recepción de obra por parte de la municipalidad.»
Ley N.º 29571, Código de Protección y Defensa del ConsumidorArtículo 19read
The seller answers for the fitness of what it sells
«El proveedor responde por la idoneidad y calidad de los productos y servicios ofrecidos»
Guía sobre productos y servicios inmobiliarios — IndecopiII.3. Entrega del bienread
The seller's duties do not end at handover
«Las obligaciones del proveedor inmobiliario no terminan con la entrega de los inmuebles al consumidor, debido a que debe garantizar que sus características sean las mismas que se ofrecieron y se pactaron en las dos primeras etapas del proceso de compra, incluidas las que correspondan a las áreas comunes, así como aspectos legales.»
↳II.3. Entrega del bien (recuadro «Importante»)read
Recording problems at handover is your evidence
«Resulta indispensable que el consumidor deje constancia de las disconformidades verificadas al momento de la entrega del inmueble, a efectos de contar con algún medio probatorio para sustentar un eventual reclamo o denuncia administrativa contra el proveedor.»
↳II.3. Entrega del bien — Saneamiento físicoread
Defects may be noticed at handover or later
«Cabe precisar que los errores o defectos pueden ser advertidos al momento de la recepción del inmueble por parte del consumidor, o de manera posterior.»
Código Civil (Decreto Legislativo N.º 295)Artículo 1503read
The seller answers for hidden defects
«El transferente está obligado al saneamiento por los vicios ocultos existentes al momento de la transferencia.»
↳Artículo 1504read
What you could have seen with due care is not a hidden defect
«No se consideran vicios ocultos los que el adquirente pueda conocer actuando con la diligencia exigible de acuerdo con su aptitud personal y con las circunstancias.»
↳Artículo 1514read
Time bar counted from receipt of the property
«Las acciones a que se refieren los Artículos 1511º y 1513º caducan a los tres meses si se trata de bienes muebles y a los seis, de inmuebles. Los plazos se computan desde el momento de la recepción del bien.»
↳Artículo 1784read
Contractor's liability to the commissioning party for construction defects
«Si en el curso de los cinco años desde su aceptación la obra se destruye, total o parcialmente, o bien presenta evidente peligro de ruina o graves defectos por vicio de la construcción, el contratista es responsable ante el comitente o sus herederos, siempre que se le avise por escrito de fecha cierta dentro de los seis meses siguientes al descubrimiento. Todo pacto distinto es nulo.»
Also searched as: what happens if I sign conforme on my apartment handover in Peru · can I claim defects after signing the acta de entrega · what to write in the observations of the handover certificate · developer won't let me write observations on the handover form · new apartment handover checklist Peru · signed conforme and now there is a leak what can I do · warranty on a new apartment in Peru after handover
Related
Buying a home in Peru: what to check before you sign, pre-construction or already built
Buying from a developer isn't the same as buying from an individual — the law gives you information rights and a 10-year warranty.
HousingHidden defects in a Peru property sale: what you can claim
You can void the sale or ask for a price cut over a hidden defect, but you only have 6 months to claim it.
ConsumerAdhesion contracts and unfair terms in Peru: do I have to comply with everything I signed?
Accepting a contract does not bind you to everything in it. The law lists clauses that fail even if you sign.
HousingOwners' association and common expenses in Peru: what the law says about paying (or not paying) them
Not paying common expenses isn't just a debt: it costs you your vote in the Owners' Association starting with the third unpaid fee.
ConsumerThe libro de reclamaciones: who must have one and what it costs not to
Which businesses must have one, and what a missing complaints book costs them.
HousingWhat if your new home in Peru is smaller than the area you were promised?
You got fewer square meters than you paid for. The clock started at handover, and it is short.
HousingWhat happens if a developer in Peru is late delivering your home?
You don't need to prove your losses to collect a late-delivery penalty. But there is one step you should not skip first.
What this page already lets you do
- Name the rule that protects you
- Copy the exact article and send it